Aftercare for developers
Receive defect reports from homeowners after handover, accept or decline them, send them to a contractor and close them.
The aftercare flow
Text version of the diagram
- The homeowner reports a defect from the My home screen.
- The developer accepts the defect report as a snag, or declines it with a reason.
- The developer assigns the snag to a contractor. The contractor fixes it and submits a completion.
- The homeowner sees Please confirm the fix and answers the question Is it fixed?
- The developer approves the completion. The defect report changes to Closed.
What aftercare is
After handover, homeowners can report defects in their home. They use the My home screen of the app. The defect reports come to the Aftercare tab of the management console. The tab shows only if your organization uses aftercare.
Set up aftercare
- Add the warranty classes and the units of each project. Refer to Add zones, locations and units.
- Use the email address that each homeowner gave you.
- In Settings, fill in the Homeowner care contact: email, phone and hours.
- Tap Save care contact.
Homeowners do not get an invitation. A homeowner signs in with the same email address that is on the unit. Then the app shows their home.
NOTE: The number of units in your contract has a limit. If all units are in use, you cannot add a new unit. Contact SnagOwl to change the limit.
Read the Aftercare tab
The tab shows the number of defect reports in each state:
| State | Meaning |
|---|---|
| New | The homeowner sent the defect report. Nobody answered it. |
| Accepted | You accepted it as a defect. |
| In progress | A contractor works on the snag. |
| Fix submitted | The contractor submitted a completion. |
| Closed | The defect is fixed. |
| Declined | You declined the defect report. |
| Withdrawn | The homeowner withdrew the defect report. |
Use the filters Project, State, Overdue only and Warranty class not confirmed. Each defect report shows a Respond by date and a Fix due date.
Accept a defect report
-
Tap the defect report.

-
Read the description and look at the photos.
-
Tap Accept as defect.
-
Make sure that the Title and the Description are correct.
-
Examine the Access times. The field shows the preferred access times of the homeowner.
-
Remove phone numbers and other private data from Access times.
-
Make sure that the Category and the Severity are correct.
-
Optional: enter a Reply to the homeowner.
-
Tap Accept.
SnagOwl adds a snag to an open snagging round of the zone. The contractor sees the access times on a separate line that starts with Access:. SnagOwl makes this line from the Access times field as you edited it.
NOTE: You can accept a defect report only if the zone has an open snagging round. Refer to Run an inspection.
Decline a defect report
- Tap the defect report.
- Tap Decline.
- Select the Reason.
- Enter a reply to the homeowner. SnagOwl sends the reply by email.
- Tap Decline.
The reasons are: Outside the warranty period, Not a defect, The owner’s responsibility and Already reported.
Send the snag to a contractor
- In the snag section of the defect report, tap Assign.
- Select the contractor. Refer to Assign snags to a contractor.
The contractor fixes the defect and submits a completion. Then the homeowner sees Please confirm the fix.
Close the defect report
- Tap Review completion.
- Read the answer of the homeowner: “Says it is fixed”, “Says it is not fixed” or “Has not answered yet”.
- Tap Approve if the defect is fixed.
If the homeowner did not answer, the button is Approve without homeowner. When you approve, the defect report of the homeowner closes.
Log a phone call
If a homeowner calls you, add the defect report yourself.
- Tap + Log a call.
- Select the Project and the Unit.
- Enter who called, a Title and what the homeowner reported.
- Select the Warranty class.
- Tap Create ticket.